The first farm of the arena’s visor was delivered to the stadium «Otkritie Arena» in Tushino.
- The first node of the metal truss cover was delivered to the construction site of the «Otkritie Arena». The first assembly can be seen at the stadium in May - told the official website the chief engineer Alexander Shishlo.
Share this: |
|
Твитнуть |